top of page
Welcome
About
Services
Projects
Design
Construction site
Individuals
Industry
Galery
Features
Team
Contact
More
Use tab to navigate through the menu items.
Structure studio
< Back
2026 - Paris 7th arrondissement, Partition wall demolition
Mission Structure:
Resumption of halted work
Detailed surveys of the existing situation
Geometric survey
Overall observations
Provision of a notice of resumption of work
2026
Year
Paris 7th
City
1.3
Days of Work
Project Gallery
Previous
Next
bottom of page